Uttar Pradesh Defence Industrial Corridor and Jewar Airport Project
यह प्रोफ़ाइल स्वतंत्र रूप से आधिकारिक राजपत्र अधिसूचनाओं और सत्यापित वेब डोमेन से संकलित की गई है। स्रोत प्राधिकरण लिंक: upeida.up.gov.in प्राधिकरण: Department of Industries (Uttar Pradesh) • राज्य/क्षेत्र: Uttar Pradesh • अंतिम बार ऑडिट किया गया: 12 Sep 2026
त्वरित एआई सारांश
Integrated defence manufacturing hub in Uttar Pradesh coupled with a greenfield international airport at Jewar to boost aerospace, defence production and cargo logistics.
विस्तृत सारांश
Overview
The Uttar Pradesh Defence Industrial Corridor (UPDIC) is a state‑led initiative to establish clusters for aerospace and defence manufacturing across Aligarh, Kanpur, Jhansi, Lucknow and Chitrakoot. Concurrently, the Jewar Airport project (officially Noida International Airport) is being developed as a greenfield international airport to serve the National Capital Region, with a dedicated cargo terminal aimed at becoming a major global freight hub.
Components
- Defence Corridor: Allocation of land parcels, provision of subsidized power, streamlined clearances and single‑window approvals for defence MSMEs, OEMs and ancillary units.
- Jewar Airport: Phase‑1 operational runway, cargo terminal, logistics park and multimodal connectivity (road, rail, metro) to facilitate high‑volume freight movement.
Strategic Impact
The combined infrastructure seeks to attract domestic and foreign investment, create skilled employment, reduce logistics costs for defence exports and position Uttar Pradesh as a leading aerospace‑defence hub in India.
प्रमुख लाभ और वित्तीय सहायता
| तुलना मानदंड | लाभ |
|---|---|
| प्रमुख लाभ |
|
पात्रता मानदंड प्रोफ़ाइल
| तुलना मानदंड | पात्रता |
|---|---|
| Minimum Age Limit | 18 Years or above |
| Physical Disability | Not Restricted (Anyone can apply) |
| Domicile State | All India (Central Scheme) |
आवेदन प्रक्रिया मार्गदर्शिका
- Visit the official UPEIDA defence portal (https://upeida.up.gov.in/) or the Noida International Airport Ltd. portal for sector‑specific guidelines.
- Download the Expression of Interest (EoI) form and fill in details regarding company profile, proposed investment, land requirement and employment generation.
- Attach mandatory documents: Certificate of Incorporation, PAN, GSTIN, audited financial statements of last three years, project report and requisite licences.
- Submit the completed EoI online via the portal’s submission module; a hard copy may also be sent to the UPEIDA office at Lucknow for record.
- Upon receipt, the nodal agency conducts technical and financial evaluation; shortlisted applicants are invited for detailed project report presentation and site allocation discussion.
- Successful applicants receive a Letter of Intent (LoI) followed by execution of lease agreement and commencement of statutory clearances.
इस योजना के बारे में अक्सर पूछे जाने वाले प्रश्न
Eligible permanent residents meeting the specified domicile, income, and category criteria can submit an application along with verified credentials.
Key mandatory documents include Aadhaar Card, Residence/Domicile Certificate, Income Certificate, and active Bank Account Passbook.
Benefits are directly credited to the beneficiary's Aadhaar-seeded bank account through the Public Financial Management System (PFMS) / DBT.
Applicants can track status in real-time by logging into the official portal using their Application Reference Number.